LOAD-ING 0
Üçgen Proje

Dry Dock (Fountain Pool) & Port Construction Project

ALTINOVA / YALOVA

  • Project Date : 2009-2010
  • Project Owner : BESIKTAS GROUP
  • Cost of Project : 2.348.900 USD
  • DETAILS
ABOUT THE PROJECT

The construction of a dry dock with a length of 235 meters and width of 38 meters has been completed at the Beşiktaş Shipbuilding Shipyard, which is situated on a 120-decare land.